色欲久久久久久综合网精品-色欲久久久天天天综合-色欲久久久天天天综合网精品-色欲久久久天天天综合影院-色欲男人的天-色欲人妻综合aaaaa毛

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution
Application area

Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 国自产拍在线视频 | 精品亚洲视频在线观看 | 69式成人免费视频 | 娇小的精品xXxX性色HD | 欧美大成色WWW永久网站婷 | 99尹人香蕉国产免费天天拍 | 国产精品视频全国免费观看 | 国产精品第一页欧美性猛 | 97se亚洲国产综 | 国产精品高清另 | 日韩精品欧美专区国内精品 | 性欧美暴 | 一区二区亚洲国产精品 | 亚洲欧美日韩国产另例 | 国产一二懂色红豆在线精品 | 老牛综合天堂一区二区三区 | 国产伦精品一区二区三区免 | 国产伦精品一区二区三 | 亚洲欧美中文字幕变态另类 | 性感美女视频黄是网站 | 亚洲成年人网址 | 成人一区二区在线观看 | 欧美在线视频一级二级 | A V资源网站 | 五月天亭亭国色天香视频网 | 91丝袜精品诱惑在线观看 | 国产第一区第二区 | 亚洲欧美中文日韩aⅴ一区 国产97人人摸 | 国产一区二区三区免费观看在线 | 日本免费一区二区三区 | 涩涩射 | 日本成人二区 | 精品国产九色腾 | 日本中文字幕有码在线视频 | 日韩精品一区二区三区免费视频喜 | 91香蕉亚洲 | 欧美xxxx性bbbbb喷水 | 国产精品一区二区三区四区五区 | 色屋视频国产3视频在线观看 | 国产精品中文字幕制服诱惑 | 免费福利在线观看 |