色欲久久久久久综合网精品-色欲久久久天天天综合-色欲久久久天天天综合网精品-色欲久久久天天天综合影院-色欲男人的天-色欲人妻综合aaaaa毛

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

16615

Prev Next
×
主站蜘蛛池模板: 97国产公开视频在线观看 | 亚洲日韩aⅴ在线视频 | 亚洲免费国产综合网免费观看 | 日韩国产91美女长腿丝袜 | 亚洲首页 | 日韩乱伦网 | 国产熟女网站 | 欧美人牲| 欧美动漫 | 精品福利亚洲天堂 | 欧美日本国产一区二区三区在线看 | 福利合集视频 10000 | 1000部拍视频免费看 | 国产精品系列在线观看 | 91一区二区三区 | 午夜国产一级 | 国产中文字幕在线播放 | 福利91| 91短视频官网 | 飞机杯嘿嘿色色免费网站 | 亚洲精品天堂在线 | 国产午夜福利一级二级三级 | 亚洲日韩在线精品第一品 | 一区二区激情戏 | 国产 又黄 又爽刺激软件男男 | 精品国内自产拍在线观看 | 国产 欧美 日韩 另类 | 91啪国自产| 国产一二懂色红豆在线精品 | 欧美人与牲禽ⅹxxx伦交 | 2025国产在线 | 囯产拗女一区二区三区 | 在线观看一区 | 国产在线精品一区二区夜色 | 日本蜜桃视频 | 成人v影视一区二区三区 | 91系列 | 91人 | 99ri国产| 成人蕾丝电影在线播放视频 | 亚洲欧洲日韩综合 |