色欲久久久久久综合网精品-色欲久久久天天天综合-色欲久久久天天天综合网精品-色欲久久久天天天综合影院-色欲男人的天-色欲人妻综合aaaaa毛

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16596

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 岛国一区二区三区在线播放 | 国产免费在线观看小视频 | 日韩免费观看 | 91视频 app| 亚洲国产婷婷综合在线精品 | 欧美一级特黄aaaaaa大片在线观看 | 日本精品三级 | 9l视频自拍九色9l视频 | 国产精品美乳福利在线观看 | 三级三级三级a级全黄三 | 日韩在线视频中文字幕 | 国产午夜三级一区二区三 | 三级色在线 | 中文字日产幕乱六区蜜桃 | 伊甸园秘 在线观看国产 | 亚洲欧美日韩激情 | 97天堂国产在线观看 | 91精品全国免费观看含羞草 | 国产精品人伦一区二区三区观看 | 91短视频ios| 99国产在线观看 | 欧美日韩一区二区精品视频在线观看 | 国产白丝喷浆视频 | 国产白丝精品 | 国产专区亚洲欧美另类在线观看 | 中文字幕在 | 日本国产va高清视频 | 欧美在线视频 | 国产在线视欧美亚综合 | 写真午夜电影 | 97视频精品 | 涩涩视频网| 日本一级www乱码在线 | 国产综合色在线精 | 91自拍偷拍一区二区三区 | 欧美日本精品一区二区三区 | 三级黃色三級三級三級 | 日韩欧美国产动漫制服 | 日本韩国亚洲欧 | 97色在线 | 午夜福利精品a在线观看 |